Add/Edit Company-Level Approval Requirements
Approval requirements can be tailored to a clientβs workflow and deal complexity. These requirements determine when a deal must pause for approval and who is authorized to approve it.
π οΈ Where to Configure
Navigate to:
βCompany Settings > Approval Requirements
π§ Editable Fields
π Stage Gate (Required)
Specifies the stage at which an approval is required. The deal cannot advance to the next stage without an approval at this gate.
π§© Substage Gate (Optional)
Sets an approval requirement at a substage. The deal will not proceed to the next substage or stage without required approval.
π₯ Approvers
Approvers can be defined using:
Specific Users
Roles
Property Attributes (e.g., property manager, region lead)
π Roles
Displays the role associated with the approval step, if configured.
π Approval Criteria Options
Approval requirements can be based on any combination of the following criteria:
Area
Rent
Tenant Improvements (TI)
BreakEven %
Initial Cost
Net Effective Rent (NER)
Total Commission
Property Area %
Deal Type β Criteria can apply to specific deal types only.
π Additional Configuration Flags
β Match All Criteria
Toggle to specify whether all listed criteria must be met (Yes) or if any can trigger the requirement (No).
π’ Enabled / Disabled
Approval steps can be activated or deactivated using this flag.
The system will also show disabled steps for visibility and audit tracking.
β© Auto Advance Stage
When enabled, the deal will automatically progress to the next approval-required stage once the current approval is granted.
π’ Order
Specifies the sequence in which multiple approval requirements are processed.
π‘οΈ Why Use Approval Requirements?
Implementing company-level approval rules helps ensure that:
Critical financial metrics are reviewed
The correct approvers are always engaged
Deals follow a structured, auditable path to execution
For assistance with setup or complex configurations, please reach out to the Deal Manager Support Team.